REDBRIDGE CYCLING CENTRE

BEFORE

BEFORE

AFTER

AFTER
PROJECT OVERVIEW -
The Redbridge Cycling Centre refurbishment focused on enhancing the safety, durability, and everyday usability of the existing outdoor tracks.
Through targeted repairs, resurfacing, and refreshed markings, the space has been revitalised to support regular training, community sessions, and long-term performance.
SCOPE OF WORKS

EXCAVATION OF OLD TARMAC
Removal of damaged layers and preparation of the base to ensure a stable foundation for resurfacing.

KERB REPAIRS
Removal and reinstatement of damaged kerbs to stabilise track edges and improve drainage control.

Surface Preservation
Applied bituminous treatments and anti-crack membranes to seal, stabilise, and extend the lifespan of the riding surface.

Track Resurfacing
Installation of a new tarmac to provide a smooth, durable, and high-performance riding surface.
SAFER RIDING SURFACE
Improved surfaces, repaired edges, and stabilised kerbs reduce trip hazards and create a safer experience for all users.
IMPROVED RIDE QUALITY
A smoother, level tarmac finish supports better performance for training, recreational use, and competitions.
GREATER COMMUNITY USE
Improved surfaces, repaired edges, and stabilised kerbs reduce trip hazards and create a safer experience for all users.
EXTENDED LIFESPAN
Enhanced surface quality and stable edges reduce risks of accidents and injuries
