top of page

REDBRIDGE CYCLING CENTRE

IMG_6196.PNG

BEFORE

IMG_2921.JPG

BEFORE

IMG_6049 2.JPG

AFTER

IMG_7628 2.jpeg

AFTER

PROJECT OVERVIEW - 

The Redbridge Cycling Centre refurbishment focused on enhancing the safety, durability, and everyday usability of the existing outdoor tracks.


Through targeted repairs, resurfacing, and refreshed markings, the space has been revitalised to support regular training, community sessions, and long-term performance.

SCOPE OF WORKS

IMG_5641.jpg

EXCAVATION OF OLD TARMAC

Removal of damaged layers and preparation of the base to ensure a stable foundation for resurfacing.

IMG_4125.JPG

KERB REPAIRS

Removal and reinstatement of damaged kerbs to stabilise track edges and improve drainage control.

IMG_5643.jpg

Surface Preservation 

Applied bituminous treatments and anti-crack membranes to seal, stabilise, and extend the lifespan of the riding surface.

IMG_4824_edited.jpg

Track Resurfacing

Installation of a new tarmac to provide a smooth, durable, and high-performance riding surface.

SAFER RIDING SURFACE

Improved surfaces, repaired edges, and stabilised kerbs reduce trip hazards and create a safer experience for all users.

IMPROVED RIDE QUALITY

A smoother, level tarmac finish supports better performance for training, recreational use, and competitions.

GREATER COMMUNITY USE

Improved surfaces, repaired edges, and stabilised kerbs reduce trip hazards and create a safer experience for all users.

EXTENDED LIFESPAN

Enhanced surface quality and stable edges reduce risks of accidents and injuries

bottom of page